National BREAKING
22 min read

Prithvi Highway Blocked at Galaudi After Trishuli River Erosion; Authorities Target Phased Weekend Reopening

Trishuli riverbank erosion collapses pavement in Dhading; Department of Roads mobilizes hillside back-cutting with provisional 21:00 NPT single-lane reopening target.

यो समाचार नेपाली भाषामा पनि उपलब्ध छ:
नेपालीमा पढ्नुहोस् →
सम्पादकीय टोली (Editorial Board)
Saturday, 24 Ashwin 2083 BS | AD: October 10, 2026
main pic pkr copy
main pic pkr copy
Executive Summary (Key Takeaways)
  • Severe riverbank erosion by the Trishuli River caused a major roadway collapse at Galaudi in Gajuri Rural Municipality-5, Dhading.
  • The highway remains completely closed to all vehicular traffic while hillside excavation proceeds.
  • Department of Roads targets provisional one-way passage by 21:00 NPT on Saturday and two-way restoration by 18:00 NPT on Sunday.
  • Strategic corridor linking Kathmandu with Pokhara, Chitwan, and western Nepal paralyzed; air routes between Kathmandu and Pokhara remain normal.

KATHMANDU (HamroBuzz Newsroom): A critical section of the Prithvi Highway collapsed in Galaudi, Gajuri Rural Municipality-5, Dhading, after sustained undercutting by the Trishuli River severed the roadway foundation, bringing transit along Nepal's principal overland corridor to a complete standstill.

Prithvi Highway Galaudi Fact Box Sector: Galaudi, Gajuri-5, Dhading (Prithvi Highway NH04). Cause: Severe Trishuli River hydraulic bank undercutting. Current Status: Fully blocked (DoR active inland rock back-cutting). Hotline: Dhading Traffic Control (+977-9851282664), Police Emergency (100).

Confirmed Current Road Status vs. Official Reopening Schedule

As of Saturday evening, the highway remains entirely closed to traffic. The Department of Roads has announced the following operational targets, which are provisional engineering goals subject to ongoing slope stability, not completed restorations:

Phase Projected Timeline Operational Scope Conditions & Limitations Phase 1: Emergency Clearance Saturday, 21:00 NPT One-way (single-lane) Police-escorted clearance strictly for stranded vehicles on an unpaved cut-bench. Phase 2: Daytime Hillside Widening Sunday, from 07:00 NPT Scheduled work windows Excavators resume cliff cutting to widen corridor; intermittent traffic pauses expected. Phase 3: Two-Way Target Sunday, target 18:00 NPT Two-way resumption Attainment contingent upon dry weather, zero rockfall, and stable mountain geometry.

Affected Journeys: Regional Transit & Kathmandu–Pokhara Corridor

The Prithvi Highway represents the central artery linking Kathmandu with the western half of the country. This disruption halts long-haul buses, private motor vehicles, and container trucks traversing between Kathmandu and Pokhara, Chitwan (Narayangarh), Butwal, Bhairahawa, and the Terai plains via the Mugling junction.

Implications for International Tourists and Visitors

Overland Delays: Tourist buses and private car transfers between Kathmandu and Pokhara or Chitwan face prolonged gridlock. Travelers are strongly urged to reschedule road departures scheduled for Saturday night and Sunday morning. Air Travel Normal: Domestic flights between Tribhuvan International Airport (KTM) and Pokhara International Airport (PKR) operate normally and remain entirely unaffected by highway closures. Passengers with tight international flight departures should prioritize air travel. Night Safety Caution: Navigating the newly cut, unpaved single-lane bench during the proposed Saturday night window carries significant hazard from loose debris and reduced visibility.

How Passengers Can Check Conditions Before Departure

District Traffic Police Office, Dhading (Control Room): +977-9851282664 District Police Office, Dhading (Control Room): 010-520199 / +977-9851113921 Nepal Police Emergency Hotline: 100

ABOUT THE AUTHOR
सम्पादकीय टोली (Editorial Board)

सम्पादकीय टोली (Editorial Board)

Staff Reporter

Staff correspondent and investigative writer at HamroBuzz: सम्पादकीय टोली (Editorial Board)

More articles by this author

More from National

VIEW ALL

Reader Comments

0
Moderated Discussion

Leave your perspective

Hate speech and harassment are strictly prohibited0 / 1000
Loading comments...
Prithvi Highway Blocked at Galaudi After Trishuli River Erosion; Authorities Target Phased Weekend Reopening | HamroBuzz | HamroBuzz